Skip to content

Docs: Social Calendar Generation defaults for projects (408503)#417

Draft
cursor[bot] wants to merge 1 commit intomasterfrom
cursordocumentation-updates-automation-ac70
Draft

Docs: Social Calendar Generation defaults for projects (408503)#417
cursor[bot] wants to merge 1 commit intomasterfrom
cursordocumentation-updates-automation-ac70

Conversation

@cursor
Copy link
Copy Markdown

@cursor cursor Bot commented Apr 1, 2026

Jira

Change classification

  • UI / UX change
  • Configuration / system behavior
  • Feature behavior change

Summary of documentation updates

Updated existing Task Manager project documentation to reflect Social Media Manager defaults for Social Calendar Generation:

  1. Updated terminology in existing content

    • Replaced references to automated social post task generation language with Social Calendar Generation naming in the Projects overview and FAQ.
  2. Added Social Calendar Generation defaults section

    • Added a concise defaults subsection under Create and manage projects documenting:
      • default AI model (Gemini Flash Latest)
      • schedule type (On a Schedule)
      • frequency (Weekly)
      • day (Monday)
      • time (9:00 AM)
      • timezone (from SMB timezone in Business App)
      • start date (current date)
      • end date (No end date)
      • availability (web and mobile)
      • applicability (Social Media Manager)

Existing docs updated vs new docs

  • Updated existing docs only
  • No new docs or navigation entries created

Placement reasoning

  • The change applies directly to Social Calendar project setup behavior.
  • The best-fit existing location is:
    • docusaurus/docs/fulfillment/task-manager/projects/create-and-manage-projects.mdx (where Social Calendar options are configured)
    • docusaurus/docs/fulfillment/task-manager/projects/index.mdx (overview terminology consistency)
  • Creating a new page was not necessary because the behavior fits naturally within existing Social Calendar project setup instructions.

Acceptance criteria coverage

  • AC: Rename feature from "Social Post Generation" to "Social Calendar Generation"
    • Covered by terminology updates in Task Manager Projects docs.
  • AC: Default AI model is "Gemini Flash Latest"
    • Documented in Social Calendar Generation defaults section.
  • AC: Default trigger schedule values (On a Schedule, Weekly, Monday, 9:00 AM, SMB timezone, current date start, no end date)
    • Fully documented in defaults section.
  • AC: Applicable to web and mobile
    • Documented in defaults section.
  • AC: Applicable to Social Media Manager
    • Documented in defaults section.

Figma / image usage

  • Jira screenshots were provided but not required for placement or wording because all documented behavior was explicitly defined in acceptance criteria and story text.
  • No new images were added.

Skills used

  • Reviewed repository skill: sprint-review (process and repo compliance guidance)
  • Used repository discovery tools (search/glob/read) to locate best-fit existing pages before editing.

Validation

  • Built docs successfully after dependencies install.
  • Build reports existing repository-wide broken links/anchors unrelated to this PR.

Assumptions and limitations

  • No dedicated Social Media Manager/Social Calendar Generation page currently exists in this repository; updates were applied to the closest existing Social Calendar project docs to avoid unnecessary new content.
  • Could not identify linked implementation PR authors via GitHub search using Jira key/title/keywords, so no additional code-author tags were added.

Mentions

@ahnikakuse
@haleyserrano
@maryam6samadi

Open in Web View Automation 

Co-authored-by: Haley <haleyserrano@users.noreply.github.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant