Skip to content

Pull requests: openshift/cluster-logging-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Add proxy feature to loki output needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#3177 opened Jan 9, 2026 by Lune-Mercier Loading…
LOG-8130: fix network policy ingress port for metrics approved Indicates a PR has been approved by an approver from all required OWNERS files. release/6.4
#3176 opened Jan 7, 2026 by jcantrill Loading…
LOG-6385: Refactor audit input generation to use struct approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3175 opened Jan 7, 2026 by jcantrill Loading…
LOG-8381: Update go version to 1.24 approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. midstream/Dockerfile A Dockerfile.in sync is needed with midstream
#3173 opened Jan 5, 2026 by jcantrill Loading…
[release-6.3]LOG-8304:Add support for configuring the maximum message length (in bytes) after merging partial log lines in the kubernetes_logs source do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3169 opened Dec 12, 2025 by vparfonov Loading…
[release-6.2]LOG-8292:Add support for configuring the maximum message length (in bytes) after merging partial log lines in the kubernetes_logs source approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. release/6.2
#3168 opened Dec 12, 2025 by vparfonov Loading…
doc: Article on high volume log loss. approved Indicates a PR has been approved by an approver from all required OWNERS files. release/6.4
#3166 opened Dec 4, 2025 by alanconway Loading…
[release-6.3]LOG-8138:Update CLO code to use Vector v0.47.0 approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. release/6.3
#3164 opened Dec 2, 2025 by vparfonov Loading…
LOG-8090: escape 'new line' (\n) in EventRouter message jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. release/6.4
#3162 opened Nov 24, 2025 by vparfonov Loading…
[release-5.9]LOG-5108: Add missing annotation: operators.openshift.io/must-gather-image approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. release/5.9
#3158 opened Nov 13, 2025 by vparfonov Loading…
WIP:try Vector v0.50 DO-NOT-MERGE do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3139 opened Oct 17, 2025 by vparfonov Loading…
Use structure marshaling do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3128 opened Oct 7, 2025 by vparfonov Draft
LOG-7892: support NDJSON for http sink do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. release/6.4
#3074 opened Jul 2, 2025 by AndrewChubatiuk Loading…
ProTip! Add no:assignee to see everything that’s not assigned.