-
Notifications
You must be signed in to change notification settings - Fork 39
Pull requests: openshift/cert-manager-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
OAPE-494: Add RHCOS 10/RHEL 10 compatibility testing infrastructure
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#376
opened Mar 6, 2026 by
chiragkyal
•
Draft
CM-937: Automate e2e tests for Azure DNS01 AAD Workload Identity auth
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#375
opened Mar 6, 2026 by
lunarwhite
•
Draft
2 tasks done
CM-902: Fix golangci-lint errors#368
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#372
opened Feb 26, 2026 by
anandkuma77
Loading…
CM-866: Add TrustManager controller and E2E tests framework
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#371
opened Feb 23, 2026 by
chiragkyal
Loading…
dependabot: add config
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#256
opened Mar 18, 2025 by
sebrandon1
Loading…
context consistency: ensure all context are TODO()
ok-to-test
Indicates a non-member PR verified by an org member that is safe to test.
#242
opened Feb 6, 2025 by
sebrandon1
Loading…
ProTip!
Type g i on any issue or pull request to go back to the issue listing page.