pypsa-ppa

A PyPSA-based toolkit for exploring how a renewable energy Power Purchase Agreement (PPA) actually performs once you put real weather and market prices behind it.

Proof of concept. This is a research and demonstration tool, not a production planning system. Data, cost assumptions and results throughout are illustrative. Nothing here should be used to make real investment, procurement or legal decisions without independent verification. Claude was used to support some parts of the prototyping efforts, primarily on the UI side, although all produced code was reviewed by human contributors in the PR process. It's provided as-is, with no warranty; see LICENSE.

What this actually does

You describe a portfolio (wind, solar, optionally battery storage) and an offtaker under a PPA contract with a delivery obligation, a shortfall allowance, and a penalty for missing it. The toolkit builds an hourly linear program, dispatches the portfolio against real European day-ahead prices and renewable capacity factors, and reports whether the contract gets met, what it costs to serve, and what the underlying project economics look like.

It can also flip that around and size the portfolio itself: instead of telling it how much wind and solar to build, you give it a budget ceiling per technology and it works out the least-cost mix to serve the contract.

On top of the energy-side simulation sits a full project-finance model (debt sizing, tax, depreciation, IRR) and a sensitivity analysis tool that can explore financial assumptions instantly without re-running the optimization.

A Streamlit app ties all of this together with four predefined case studies and a fully customizable scenario form.

Setup

This project uses pixi for environment management. A requirements.txt is also provided for plain pip installs (for example, deploying to Streamlit Community Cloud).

1. Install pixi

curl -fsSL https://pixi.sh/install.sh | bash
# Restart your shell or run: source ~/.bashrc

2. Install the environment

cd pypsa-ppa
pixi install

This resolves a fully pinned environment (pixi.lock) from conda-forge: PyPSA, HiGHS, Linopy, Streamlit, and the rest of the stack.

3. Run the app

pixi run app

Opens at http://localhost:8501.

4. Run the tests

pixi run test

Runs the full suite (tests/) in well under a minute; no network access or API tokens required (data-download tests mock HTTP, everything else uses tiny in-memory fixtures).

5. Run the worked-example notebook

pixi run notebook

Opens notebooks/pypsa_ppa_example_v1.ipynb, the original single-scenario worked example this project grew out of. It predates the European data pipeline and multi-year simulation described below, so treat it as historical context rather than the current entry point. The Streamlit app is where active development happens.

Data access

The app needs free API tokens to download market and weather data:

Tokens are entered in the Get Data tab and kept only for the session, never written to disk. A handful of locations are already cached under data/cache/ so you can try the app before requesting your own tokens.

Walking through the app

The tabs run roughly in the order you'd use them:

Tab What it's for
Welcome Orientation: what the tool does and where the data comes from
1. Case Setup Pick one of four predefined case studies, or open the form and build your own scenario from scratch
2. Get Data Check what's cached for your chosen locations, download whatever's missing, or upload your own price/weather data instead
3. Optimization Run the simulation: either a single reference month for a quick look, or the full multi-year run
4. Results Hourly dispatch, generation stats, and a comparison against alternative procurement strategies (spot-only, forward-hedged, blended)
5. Financial Model The full levered project-finance model, run on top of the energy results, with an Excel export
6. Sensitivity Analysis Instant what-if and tornado-chart analysis over financial assumptions, no re-run needed
7. HELP A primer on PPA structures and the terminology used throughout the app

Scenario model

Every run is driven by a Scenario (ppa/scenario.py), which covers, broadly:

  • Portfolio: wind/solar/battery capacity, or, in sizing mode, per-technology build ceilings and let the optimizer choose
  • Contract terms: offtake volume, load shape, PPA tariff, required delivery share, shortfall allowance, penalty multiple
  • Market interaction: whether market buying/selling is allowed, and how much
  • Locations: offtaker, PV and wind sites can each sit at a different lat/lon; the offtaker's location determines the price zone
  • Simulation: number of years, first simulation year, price escalation, technology degradation
  • Financial assumptions: capex, opex, discount rate, target IRR

Predefined case studies

Case study Offtaker Portfolio Delivery / penalty Notes
⚓ The Foundation Deal Cement plant 300 MW wind + 80 MW solar, no battery 70% / 1.5× Wind-dominant baseline, market buying disabled entirely
☀️ Solar + Storage Play Green hydrogen electrolyser 80 MW wind + 450 MW solar + 50 MW / 200 MWh battery 75% / 1.5× PV-heavy with a 4-hour battery for time-shifting
📈 Merchant Hybrid Steel EAF 250 MW wind + 200 MW solar + 60 MW / 240 MWh battery 90% / 2.0× Tighter obligation, market buying allowed, wider spread
🏢 Corporate PPA Data centre 280 MW wind + 200 MW solar + 90 MW / 360 MWh battery 90% / 1.2× Premium tariff, near-zero market buying, 15-year term

Each case study also carries its own offtaker load shape (see below) and storyline in the Case Setup tab. Everything not listed above falls back to the scenario defaults.

Capacity co-optimization

Toggle "Co-optimize capacities & dispatch" in the form and the sliders for wind/solar/battery MW turn into build ceilings instead. The optimizer sizes all three together to minimize the cost of serving the contract. Merchant sales earn nothing during sizing, specifically so it doesn't overbuild just to sell into the market. The battery's power rating is optimized; its duration (hours of storage) stays fixed at whatever ratio you set.

Because a full hourly 25-year investment LP isn't practical, this runs at a coarser time resolution (3-hour blocks by default) over a capped horizon, then hands the resulting capacities to the normal hourly multi-year dispatch for the numbers you actually see. See docs/MODEL.md for exactly how that approximation works and how well it holds up against a full hourly solve.

The optimization model, briefly

The energy-side model is a linear program: wind and solar dispatch against their capacity factors, a battery that can charge from either wind or solar but not from the market, representing a co-located renewables-plus-storage plant, a market-buy and market-sell option, and a penalty generator that makes the model always solvable even when the portfolio can't fully cover the contract, just expensive to rely on. The contract's shortfall allowance and any market-buy limit are enforced as caps relative to total load or delivery, computed per calendar year in multi-year sizing runs so the optimizer can't concentrate all its slack into one bad weather year.

The full variable list, objective function and every constraint, with file and line references, are written up in docs/MODEL.md.

Financial model

Two separate models live in this toolkit:

  • A quick unlevered LCOE/IRR/NPV check, shown right in the Optimization and Results tabs.
  • A full levered project-finance model (the Financial Model tab): devex paid as a lump sum at FID, debt sized to a DSCR target across contracted and uncontracted revenue, tax with loss carry-forward, book and tax depreciation, Project IRR and Equity IRR, a full balance sheet and cash flow statement with a balance check, and a live-formula Excel export with a full hourly sheet per simulated year.

The levered model was ported from an Excel-based project-finance workbook and originally validated against it (gearing, Project IRR and Equity IRR within about 0.3 percentage points). It has since diverged deliberately from that benchmark — devex timing was changed from a multi-year development spend to a lump sum at FID — so treat that figure as historical rather than a live guarantee.

The Sensitivity Analysis tab runs on top of this model's inputs; it varies 24 financial parameters across capex, opex, revenue, indexation, debt and tax, and updates results instantly without touching PyPSA. Anything that would actually change dispatch, like capacity or delivery share, still needs a re-run in the Optimization tab.

Full methodology in docs/FINANCIAL_MODEL.md.

Locations and market data

Offtaker, PV and wind sites are independent lat/lon points. The offtaker's location determines the price zone via a nearest-anchor lookup across roughly 40 European ENTSO-E bidding zones (handling multi-zone countries like Italy, Norway and Sweden), with a manual override available if the automatic pick is wrong for a border location. Great Britain is intentionally excluded: ENTSO-E stopped publishing GB day-ahead prices after Brexit.

An optional transmission/grid-use charge (€/MWh) applies to every MWh actually delivered to the offtaker, regardless of source, so it factors into both the dispatch decision and the reported margin.

Renewable capacity factors and day-ahead prices are cached under data/cache/ per location and price zone, so a scenario in Italy doesn't accidentally reuse German data. That used to be a real bug, before locations were made explicit per asset.

Bringing your own data

If you don't want to rely on ENTSO-E and renewables.ninja, the Get Data tab can also produce a CSV template pre-filled with whatever's already cached for your scenario's locations, covering every weather year the app cycles through. Fill in day-ahead prices and PV/wind capacity factors for any subset of years and re-upload it: those years use your data instead, and every other year keeps using downloaded or cached data as normal.

Offtaker load profiles

Profile Source Typical load factor
Flat Synthetic constant 100%
Cement plant Real hourly data from FfE open data ~68%
Steel EAF Real hourly data from FfE open data ~97%
Green hydrogen electrolyser Synthetic, flexes toward cheap renewable hours ~78%
Data centre Synthetic, near-flat ~88%
Aluminium smelter Synthetic ~97%

The two FfE-derived profiles come from real measured hourly load data (2017 reference year, following the approach of PyPSA-EUR PR #1875), mapped onto any simulation year by averaging over matching month/weekday/hour triplets so the seasonal and weekly pattern survives even though the underlying data is a single fixed year.

Project structure

pypsa-ppa/
├── streamlit_app.py             # App entry point (pixi run app)
├── pixi.toml / pixi.lock        # Environment definition and lockfile
├── requirements.txt             # Pinned pip install for non-pixi deployments
├── docs/
│   ├── MODEL.md                 # Full optimization model formulation
│   └── FINANCIAL_MODEL.md       # Full financial model methodology
├── data/
│   └── cache/                   # Cached ENTSO-E prices and renewables.ninja CFs
├── ppa/                          # Core library, no Streamlit dependency
│   ├── scenario.py               # Scenario dataclass + predefined case studies
│   ├── network.py                # PyPSA network builder
│   ├── solver.py                 # PPA-specific constraints + HiGHS solve
│   ├── sizing.py                 # Capacity co-optimization
│   ├── multi_year.py             # Multi-year simulation runner (parallel, memory-aware)
│   ├── results.py                # Result extraction into typed dataclasses
│   ├── financials.py             # Quick unlevered CAPEX/LCOE/IRR/NPV
│   ├── financial_model.py        # Levered project-finance model
│   ├── financial_model_excel.py  # Live-formula Excel export of the financial model
│   ├── sensitivity.py            # Sensitivity analysis engine
│   ├── counterfactuals.py        # PPA vs spot/forward/blended procurement comparison
│   ├── industrial_profiles.py    # Offtaker load profile library
│   ├── data_loader.py            # Legacy single-CSV timeseries loader
│   └── data/                     # External data sourcing
│       ├── bidding_zones.py      # Lat/lon to ENTSO-E zone mapping
│       ├── entsoe_client.py      # ENTSO-E day-ahead price fetch/cache
│       ├── european_data.py      # Assembles per-scenario hourly timeseries
│       ├── renewables_ninja.py   # Wind/PV capacity factor fetch/cache
│       └── ffe_profiles.json     # Cached FfE 2017 reference load data
├── ui/                           # Streamlit UI layer
│   ├── scenario_form.py          # The full interactive parameter form
│   ├── state.py                  # Session state accessors
│   └── tabs/                     # One module per tab
└── notebooks/
    └── pypsa_ppa_example_v1.ipynb  # Original single-scenario worked example

Dependencies

Managed by pixi from conda-forge, with a matching requirements.txt for pip-based deployments:

Package Purpose
pypsa Energy system modelling and network optimization
highspy HiGHS LP solver
linopy Linear programming backend for PyPSA
streamlit Web application framework
plotly Interactive charts
scipy Financial analysis (IRR via Brent's method)
entsoe-py ENTSO-E Transparency Platform client
folium / streamlit-folium Interactive location map in the scenario form
pypsatopo Network topology diagrams (notebook only, installed from PyPI)

Known limitations

Worth knowing before you rely on this for anything beyond exploration:

  • The automated test suite (pixi run test, in tests/) covers the core modules (scenario, network, solver, sizing, financial model, data download, etc.) and a Streamlit launch smoke test, but not per-tab UI behaviour. Financial-model changes are still cross-checked manually against the source workbook.
  • The capacity sizing LP is a time-coarsened approximation, not an exact hourly solve (see docs/MODEL.md).
  • Cached weather and price data currently spans 2018-2024; multi-year simulations beyond that cycle through the cached years.
  • Great Britain isn't supported as a bidding zone, since ENTSO-E doesn't publish GB day-ahead prices post-Brexit.

License

MIT, see LICENSE. This is a proof-of-concept research tool; use the results accordingly.

About

PyPSA based toolkit for simulating and optimizing PPAs under different scenarios.