You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Kyriakos Chatzidimitriou edited this page Nov 12, 2013
·
4 revisions
By double-clicking the Runs node, the user can see in a grid the runs of scenarios of the corresponding project. The user can delete a Run, watch the progress by pressing the Refresh button of incomplete Runs, or to compare runs by selecting multiple Runs (Ctrl+click) and then pressing the Compare button. Through this tab the user can also upload a file (Upload file) with electrical measurements in order to compare it with the simulation results. The format of the uploaded file should be CSV and it structure should be like the following example: