Skip to content

pr-validation

pr-validation #2354

Triggered via schedule March 3, 2026 04:59
Status Failure
Total duration 4m 4s
Artifacts 3

pr_validation.yml

on: schedule
Matrix: run_tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
run_tests (ubuntu-latest, 3.11)
Process completed with exit code 2.
run_tests (ubuntu-latest, 3.13)
The strategy configuration was canceled because "run_tests.ubuntu-latest_3_11" failed
run_tests (ubuntu-latest, 3.13)
The operation was canceled.
run_tests (ubuntu-latest, 3.13, --pre)
The strategy configuration was canceled because "run_tests.ubuntu-latest_3_11" failed
run_tests (ubuntu-latest, 3.13, --pre)
The operation was canceled.
run_tests (ubuntu-latest, 3.12)
The strategy configuration was canceled because "run_tests.ubuntu-latest_3_11" failed
run_tests (ubuntu-latest, 3.12)
The operation was canceled.

Artifacts

Produced during runtime
Name Size Digest
test-coverage-report-0 Expired
149 KB
sha256:a01df9210e1223ebc814a730add67e3e053e6b33c29dd34a4e26e977b6759044
test-coverage-report-1 Expired
150 KB
sha256:a2e1bdf3f5a13664a3595045971ceab9155799d560114ca66700b6d5804216a6
test-coverage-report-3 Expired
150 KB
sha256:61d88ba680e9d37369b7708f03552bbf894d9611a8c396198da04c7563a149f3