Skip to content

Merge pull request #309 from python-ellar/code_documentation #1702

Merge pull request #309 from python-ellar/code_documentation

Merge pull request #309 from python-ellar/code_documentation #1702

Triggered via push December 28, 2025 17:10
Status Cancelled
Total duration 11h 55m 13s
Artifacts

test_full.yml

on: push
codestyle
50s
codestyle
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

10 errors
test (3.13)
The job has exceeded the maximum execution time of 6h0m0s
test (3.13)
The operation was canceled.
test (3.10)
The job has exceeded the maximum execution time of 6h0m0s
test (3.10)
The operation was canceled.
test (3.9)
The job has exceeded the maximum execution time of 6h0m0s
test (3.9)
The operation was canceled.
test (3.12)
The job has exceeded the maximum execution time of 6h0m0s
test (3.12)
The operation was canceled.
test (3.11)
The job has exceeded the maximum execution time of 6h0m0s
test (3.11)
The operation was canceled.