chore(deps): bump candle-nn from 0.8.4 to 0.9.1 #58
ci.yml
on: pull_request
Security Checks
3m 25s
Dependency Check
42s
Matrix: test
Annotations
5 errors
|
Test (macos-latest)
Process completed with exit code 101.
|
|
Test (windows-latest)
The strategy configuration was canceled because "test.macos-latest" failed
|
|
Test (windows-latest)
The operation was canceled.
|
|
Test (ubuntu-latest)
The strategy configuration was canceled because "test.macos-latest" failed
|
|
Test (ubuntu-latest)
The operation was canceled.
|