Repository navigation
BAML Runtime #110
primary.yml
on: schedule
typecheck
1m 56s
build-wasm
2m 27s
test-generators
7m 58s
sync-zed-repository
0s
Matrix: build-cli
Matrix: lint
Matrix: tests
Annotations
14 errors and 3 warnings
|
lint (rust-lint)
Process completed with exit code 101.
|
|
lint (rust-lint-wasm)
The strategy configuration was canceled because "lint.rust-lint" failed
|
|
lint (rust-lint-wasm)
The operation was canceled.
|
|
lint (typescript-lint)
The strategy configuration was canceled because "lint.rust-lint" failed
|
|
lint (typescript-lint)
The operation was canceled.
|
|
lint (rust-format)
The strategy configuration was canceled because "lint.rust-lint" failed
|
|
lint (rust-format)
The operation was canceled.
|
|
lint (python-lint)
The strategy configuration was canceled because "lint.rust-lint" failed
|
|
lint (python-lint)
The operation was canceled.
|
|
tests (rust-unit)
Process completed with exit code 101.
|
|
tests (python-integration)
The strategy configuration was canceled because "tests.rust-unit" failed
|
|
tests (python-integration)
The operation was canceled.
|
|
typecheck
Process completed with exit code 101.
|
|
build-wasm
Process completed with exit code 101.
|
|
test-generators
Unexpected input(s) 'install-protoc-gen-go', valid inputs are ['go-version', 'cache', 'install-goimports', 'architecture', 'target-os', 'target-arch']
|
|
test-generators
Failed to restore: "/usr/bin/tar" failed with error: The process '/usr/bin/tar' failed with exit code 2
|
|
test-generators
Unexpected input(s) 'install-protoc-gen-go', valid inputs are ['go-version', 'cache', 'install-goimports', 'architecture', 'target-os', 'target-arch']
|