ci: fix the #7205 relapse on the scheduled gate arm, and reap dead PR runs (#7966) #250
container-tests.yml
on: pull_request
Matrix: Hermetic Tests (Layer A + B)
Layer C — Integration (macOS / apple/container)
8m 57s
Layer C — Integration (Linux / podman)
1m 34s
Layer D — E2E (Linux / docker)
0s
Matrix: Layer E — Fuzz (libfuzzer)
Container Tests Gate
51s
Annotations
4 errors
|
Hermetic Tests (Layer A + B) (macos-14)
The run was canceled by @proggeramlug.
|
|
Layer C — Integration (macOS / apple/container)
The run was canceled by @proggeramlug.
|
|
Container Tests Gate
The run was canceled forcefully by @proggeramlug.
|
|
Container Tests
The run was canceled forcefully by @proggeramlug.
|