ci: fix the #7205 relapse on the scheduled gate arm, and reap dead PR runs (#7966) #248
container-tests.yml
on: pull_request
Matrix: Hermetic Tests (Layer A + B)
Layer C — Integration (macOS / apple/container)
36s
Layer C — Integration (Linux / podman)
36s
Layer D — E2E (Linux / docker)
Matrix: Layer E — Fuzz (libfuzzer)
Container Tests Gate
2s
Annotations
8 errors
|
Layer C — Integration (macOS / apple/container)
Canceling since a higher priority waiting request for container-tests-refs/pull/7969/merge exists
|
|
Hermetic Tests (Layer A + B) (macos-14)
Canceling since a higher priority waiting request for container-tests-refs/pull/7969/merge exists
|
|
Layer C — Integration (Linux / podman)
Canceling since a higher priority waiting request for container-tests-refs/pull/7969/merge exists
|
|
Hermetic Tests (Layer A + B) (ubuntu-24.04)
Canceling since a higher priority waiting request for container-tests-refs/pull/7969/merge exists
|
|
Hermetic Tests (Layer A + B) (ubuntu-24.04)
The operation was canceled.
|
|
Container Tests Gate
Process completed with exit code 1.
|
|
Container Tests Gate
hermetic tier failed: cancelled
|
|
Container Tests
Canceling since a higher priority waiting request for container-tests-refs/pull/7969/merge exists
|