Skip to content

[BUG] Nodal and Country level costs in result summaries incomplete #248

Description

@maartenbrinkerink

Conda environment check

  • I have tried using the osemosys-global conda environment.

Current Behavior

The calculation of nodal and country level costs in result_summaries, e.g. TotalCostNode.csv and PowerCostNode.csv, are incomplete as they do not include costs associated to country level mining technologies (e.g. MINCOAIND) or international mining technologies (e.g. MINCOAINT) nor do they cover the costs associated to PWRTRN.

Expected Behavior

For the above mentioned costs to be included. This will require a proxy (e.g. based on generator fuel costs) to downscale global level mining (e.g. MINCOAINT) to country/nodal level and country level mining (e.g. MINCOAIND) to nodal level.

Steps To Reproduce

No response

Operating System

No response

Log output

No response

Anything else?

No response

Metadata

Metadata

Assignees

No one assigned

    Labels

    bugSomething isn't working

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions