Set up Branch-specific investment cost inputs for Transmission Lines to Switch #105

@danlivengood

Description

@danlivengood

🚀

  • Is your feature request essential for your project?

Describe the workflow you want to enable

Currently, the transmission line investment cost input to Switch is a single value for the entire country.
Big picture: we want to develop a workflow that can modify any or every investment cost value for each transmission line around the country.
This is step 1 of that process: allowing for an override process while also ensuring that each transmission line has an investment cost value.

Describe your proposed implementation

Unlike issue #98, this feature request appears to be (a little) more involved. There currently is no function like build_gen_build_costs for transmission lines and thus likely needs to be added.

Similar to Issue #98, we also likely want an optional parameter input to grid_to_switch.py that could be a Series, Dictionary, or DataFrame to set trans_capital_cost_per_mw_km for each branch.
This will need an additional column in the branch data sent to Switch

This parameter has
Index branch_id
If it is a single column, it is assumed to apply to all investment years.
If it has multiple columns, then each column is assumed to map to a particular investment year

Describe alternatives you've considered, if relevant

None at this time.

Additional context

There is an open question of how to handle hypothetical branches that don't correspond to original branched: similar to issue #69 for plants

Metadata

Metadata

Type

No type
No fields configured for issues without a type.

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions