Skip to content

Add existing storage devices when preparing Switch inputs #103

Description

@danielolsen

🚀

  • Is your feature request essential for your project?

Describe the workflow you want to enable

I wish a Grid object containing energy storage could be used to create Switch inputs, and the existing energy storage would be interpreted as a fixed investment like other existing generators. This was brought up in #101 but considered out of scope of that PR.

Describe your proposed implementation

We probably want to change the call signatures of build_generation_projects_info, build_gen_build_costs, and build_gen_build_predetermined to take not only the plant dataframe, but a whole Grid, so that the information about existing storage devices can be added the the eventual output of these CSVs as well.

Metadata

Metadata

Type

No type
No fields configured for issues without a type.

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions